Thanks yall. Despite being off here and there, the wife believes we can overcome whatever went wrong. I gotta put my faith in her. Shes never let me down yet.
I anchored the 2x8's with 4" lag screws and am ready to start on a hole, but im stuck trying to figure out what goes where.
I want a concreted pier for down the road and I want a concrete square to set the dob on. I know I should have went bigger but 12" boards seem to be all I can have here in corn-pole ville.
Scott showed a pic of a bricked in concrete square staggered from the concreted pier area, neither was dead in the middle.
I took a pic and want to see what people think about the lay out idea.
I thought about making my concrete square for the dob 25 1/2", and the pier thingie 12-14".
In this pic were standing at the south wall (which will be lower) with the dob just inside to the right, and the pier back towards the left.
The squares arent straight or anything, just some scrap wood I put together to get an idea of what the setting might look like.