Two hours at WalMart after doing concrete and cutting floor joist pieces all day will flat wear you out.
Okay heres some pics. The new pier slab is about 4 inches under where the floor will be, about 5 1/2" once youcount the flooring.
It turned out kinda weird I think. I guess the water in the concrete worked its way to the top and left weird little swirls as well as some odd looking little holes that were not in there.
Its still level, moreso than the dob slab that became just a hair off from perfect, I guess from settling.