Re: Questions about Sonotube based piers
07/07/08 06:16 PM
|
|
|
Hi Mike, Good to hear from you..,
Quote:
skybsd,
I did mine in a single pour using a plastic footer form. You can read more about them here -> http://www.bigfootsystems.com/ While it made for digging a bigger hole, I was able to install, level and backfill before I did the pour. I have construction pictures posted on my website: www.graystarobservatory.com
Thanks for the links. I need to clarify a couple of things though..,
What exactly do you mean by "back-filling"? Looks to me that you: -
Dug the hole Installed and leveled the Bigfoot footer "Backfilled" the footer???? Secured the tube to the footer Poured the concrete into the tube Left the concrete in tube to set
So..,
What's that backfilling all about? Is the hole you dug the same diameter of the tube?
Thanks.
Regards,
skybsd
|
|
0 registered and 2 anonymous users are browsing this forum.
Moderator: Chris Schroeder, csa/montana
|
Forum Permissions
You cannot start new topics
You cannot reply to topics
HTML is disabled
UBBCode is enabled
|
Rating:
Thread views: 744
|
|
|
|
|
|
|