Making rebar cage for pier
Used wood template with 1/2” holes to help keep alignment of 4’ ver...
- 432
- 0
Lumber arrived for ROR observatory
Size will be 8’x8’. Using all pressure-treated lumber. 2x6 base rin...
- 484
- 0
Part of deck installed on ROR Observatory
On Easter 4/12/20 managed to sneak out to work a few more hours and...
- 392
- 0
Deck finished around ME Pier
Finished deck on 4/14/20 and switched from 48” MX pier to 42” ME pi...
- 401
- 0
My ME II/OAE has arrived!
I specifically purchased ME II for my backyard ROR observatory whic...
- 300
- 0
Two walls prepared for the ROR observatory
Have a ‘shorter’ 4-ft lower side wall which is for south (will be a...
- 315
- 0
A few walls are up on ROR observatory
Have shorter 4-ft lower part of South and 6-ft West up now. The fra...
- 418
- 0
Four walls done for ROR observatory
Looking thru ‘door’ opening (NE corner) towards lower 4-ft south wa...
- 420
- 0
Rear panel of ROR extended / mid-construction
during construction of split roof with rear ‘4x8’ on sliders extend...
- 376
- 0
ROR during construction
South side view from street below with rear 4x8 slide-out roof pane...
- 328
- 0
ROR during construction
Framing of front half of split-roof on sliders is in progress. Back...
- 319
- 0
Split roof observatory/in-construction
Snapshot with slide-out split-roof closed. Still a few weeks until...
- 518
- 0
Split roof observatory open (in-construction)
Snapshot with slide-out roof sections extended (slide North and Sou...
- 351
- 0
Split roof observatory closed (in construction)
View from east side showing split roof panel overlap. The rear pane...
- 381
- 0
Split Roof Observatory (in construction)
View looking towards south. Have applied GAF Weathershield product...
- 442
- 0
Split roof observatory (in construction)
Have weathershield and 30# felt on north segment of slide-out roof...
- 433
- 0
Split Roof observatory (in construction)
Finally have the Onduvilla shingle roofing completed. The wide ridg...
- 411
- 0
Observatory (in construction)
Added rigid XPS foam over the pressure treated lumber walls prior t...
- 475
- 0
Observatory (in construction)
View from south side at street level showing the current rough open...
- 407
- 0
Split-Roof (closed) observatory in construction
Exterior side view (looking East) with Hardie siding applied. Exter...
- 339
- 0
Inside view of observatory during construction
View from NE position (where door will go) towards pier. Not planni...
- 384
- 0
Inside view of observatory at roofline seam
Split roof from inside view at A-frame. Slide-out (500-lb set) can...
- 476
- 0
Split Roof Observatory Open
View from East. Photo taken 6/25/20 (about a week from completion o...
- 465
- 0
Split Roof Observatory (in construction)
View from street (south) with split roof open. Photo taken on on 6/...
- 480
- 0
Aleko on South Split Roof
Added the previously purchased Aleko AR950 and ran rail beside slid...
- 386
- 0
Electrical rough-in South wall
Snapshot of south wall showing outlets at base for general use and...
- 401
- 0
Electrical rough-in North wall
Snapshot during construction phase (prior to power up) of electrica...
- 406
- 0
Electrical rough-in for pier