Jump to content

  •  



- - - - -

Interior pic during observatory renovation


Interior pic during observatory renovation

The foamboard insulation is in progress (two layers of R-1 added on inner walls). I had installed 1-layer R-1 foamular panel on outside walls under tyvek before added Hardie panel in 2020. Added hydronic heater in Nov 2020 for my comfort when tinkering with equipment and roof is closed. Planewave CDK14 has been returned to observatory and is sitting on floor. Will be getting PW14 back on the Paramount ME-II/OAE shortly (but in a different parked position) with the new ROR (lower roofline by a few inches with motorized track).






    Cloudy Nights LLC
    Cloudy Nights Sponsor: Astronomics