Jump to content

  •  

CNers have asked about a donation box for Cloudy Nights over the years, so here you go. Donation is not required by any means, so please enjoy your stay.

Photo

And so it Begins.... Part II

  • Please log in to reply
79 replies to this topic

#76 NoDarkSkies

NoDarkSkies

    Surveyor 1

  • -----
  • Posts: 1,596
  • Joined: 21 Feb 2020
  • Loc: Colorado City Colorado

Posted 01 May 2023 - 11:32 AM

I cannot wait for Opening Day!


  • rockethead26 likes this

#77 rockethead26

rockethead26

    Cosmos

  • *****
  • topic starter
  • Posts: 7,847
  • Joined: 21 Oct 2009
  • Loc: Northern Arizona, USA

Posted 16 May 2023 - 12:20 PM

Front walls are being constructed as a very early monsoon pattern sets up in the sky. Traditionally, May and June are very dry and warm with monsoon kicking in sometime around July 4th. We're about 6-7 weeks early and as much as we need the rain, the construction crews are hoping for very little.

 

 

ADC wall construction 041623_resized.jpg

 


  • havasman likes this

#78 Nom De Qwerty

Nom De Qwerty

    Sputnik

  • -----
  • Posts: 46
  • Joined: 28 Dec 2018

Posted 16 May 2023 - 06:20 PM

This year's strange weather patterns in AZ continue.

 

Of course, unpredictable weather in Flag is nothing new. My senior year up there, we still had snow piled up some places during graduation ceremonies (IIRC, we had snow during finals week that year).

 

 


  • rockethead26 likes this

#79 rockethead26

rockethead26

    Cosmos

  • *****
  • topic starter
  • Posts: 7,847
  • Joined: 21 Oct 2009
  • Loc: Northern Arizona, USA

Posted 26 May 2023 - 09:30 AM

Everything, everywhere, all at once...

 

The photos will be on two separate posts today.

 

Our project manager, Dave Sawyer reports:

 

The ADC building site is a hive of activity as there were nine different trades working there this week - see attached photos. 

 

Excavation is back installing the main electrical power pads and water lines, grading the service access road, and completing the foundation backfill.

 

Extra credit: how many lifts can you count in the attached photo "lift demolition derby"?"

 

lift demolition derby.jpg

 

Interior stud walls are well underway in the astronomy gallery, and the plumbers and electricians are right behind them roughing in the utilities.

 

astro gallery.jpg

 

 

 

 


  • havasman and Nom De Qwerty like this

#80 rockethead26

rockethead26

    Cosmos

  • *****
  • topic starter
  • Posts: 7,847
  • Joined: 21 Oct 2009
  • Loc: Northern Arizona, USA

Posted 26 May 2023 - 09:34 AM

Update Part 2

 

The masons have nearly completed the block walls, with the last of the main south entrance closing in. Steel decking for the third floor lobby was stud-welded in preparation for pouring those floors next week. HVAC air handlers and ducting are being installed, along with piping for the fire sprinkler system.

 

The Front entrance and cafe.

 

cafe storefront.jpg

 

 

The Grand Staircase is taking shape.

 

grand stairs.jpg

 

 

 

 


  • seryddwr, havasman and Nom De Qwerty like this


CNers have asked about a donation box for Cloudy Nights over the years, so here you go. Donation is not required by any means, so please enjoy your stay.


Recent Topics






Cloudy Nights LLC
Cloudy Nights Sponsor: Astronomics